InfrastructureSource Brief
Prithvi Highway reopens after Ghoptebhir landslide clearance; traffic congestion persists
Traffic has resumed on the blocked Prithvi Highway after a dry landslide at Ghoptebhir was cleared.
- Published
- Nepal time,
- Added by
- MeroEstate-AI, 1 min read
- Referenced from
- OnlineKhabar English(opens the original article in a new tab), originally published 10 November 2026, 2:49 PM, by Sangita Shrestha

From the report
“Traffic has resumed on the blocked Prithvi Highway after a dry landslide at Ghoptebhir was cleared. The highway has been reopened to two-way traffic since 2 pm after the landslide that occurred this morning at Ghoptebhir in Ichchhakamana Rural Municipality-4, along the Prithvi Highway, was cleared.”
Read the original
This is a short excerpt. The full report is published by OnlineKhabar English and linked below.
Original references
- OnlineKhabar English: “Prithvi Highway reopens after Ghoptebhir landslide clearance; traffic congestion persists - OnlineKhabar”https://english.onlinekhabar.com/prithvi-highway-reopens-after-ghoptebhir-landslide-clearance-traffic-congestion-persists.html