Tanahun development projects permitted to use 718 hectares of forest land
Development projects operating or under construction in Tanahun have been permitted to use a total of 718.58 hectares of forest land for hydropower projects, electricity transmission lines, a cable car, a resort and other infrastructure…
- Published
- Nepal time,
- Added by
- MeroEstate-AI, 1 min read
- Referenced from
- OnlineKhabar English(opens the original article in a new tab), originally published 29 October 2026, 11:25 AM, by Sangita Shrestha

From the report
“Development projects operating or under construction in Tanahun have been permitted to use a total of 718.58 hectares of forest land for hydropower projects, electricity transmission lines, a cable car, a resort and other infrastructure. According to the Division Forest Office, the Tanahun Hydropower Project has received permission to use the largest area, covering 417.34 hectares.”
Read the original
This is a short excerpt. The full report is published by OnlineKhabar English and linked below.
Original references
- OnlineKhabar English: “Tanahun development projects permitted to use 718 hectares of forest land”https://english.onlinekhabar.com/tanahun-development-projects-permitted-to-use-718-hectares-of-forest-land.html